Rapid Delivery for Uf Membrane Water Filter - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We usually keep on with the principle Quality To start with, Prestige Supreme. We've been fully committed to offering our purchasers with competitively priced excellent solutions, prompt delivery and skilled support for Membrane Separation Technique , Ultra Filtration , Waste Water Filtration , sincerity and strength ,always keep approved good quanlity ,welcome to our factoty for visit and instruction and business.
Rapid Delivery for Uf Membrane Water Filter - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water Output Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering Direction Outside-in
Membrane Material Reinforced Modified PVDF
Precision 0.03  micron
Membrane Area 30m2
Membrane ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint Size Φ24.5mm

Component Material

Component Material
Hollow Fiber Membrane Reinforced Modified PVDF
Sealing Compound Epoxy Resins + Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH Range 5-9 (2- 12 when washing) Neutral PH is better for bacterial culture
Particle Diameter <2mm Prevent sharp particles to scratch membrane
Oil & Grease ≤2mg/L Prevent membrane fouling/sharp flux decrease
Hardness ≤150mg/L Prevent membrane scaling

Application Parameters

Designed Flux 15~40L/m2.h
Backwashing Flux Twice the designed flux
Operating Temperature 5~45°C
Maximum Operating Pressure -50KPa
Suggested Operating Pressure ≤-35KPa
Maximum backwashing Pressure 100KPa
Operating Mode Continuous opeartion, intermittent backwashing air flushing
Blowing Mode Continuous Aeration
Aeration Rate 4m3/h.piece
Washing Period Clean water backwashing every 1~2h; CEB every 1~2 days;Offline washing every 6~12 months

(Above information is for reference only, please adjust

according to actual differential pressure change rule)


Product detail pictures:

Rapid Delivery for Uf Membrane Water Filter - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

We're committed to furnishing easy,time-saving and money-saving one-sgood purchasing support of consumer for Rapid Delivery for Uf Membrane Water Filter - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Peru, Cairo, Kuwait, We adhere to the honest, efficient, practical win-win running mission and people-oriented business philosophy. Excellent quality, reasonable price and customer satisfaction are always pursued! If you are interested in our items, just try to contact us for more details!
  • This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Modesty from Bolivia - 2018.06.12 16:22
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Kevin Ellyson from Iran - 2017.09.29 11:19
    Write your message here and send it to us